Structural Design of Bridges / Aqueducts ( MP)

Structural Design of Bridges / Aqueducts ( MP)

 

Project Span and bridge length Super Structure Foundation
Period  Cost in lakhs

 


Status
H . L. bridge across Sindh river @ Km 15/6 of Lahar – Amayan road, Dist. Bhind, M.P. 12 spans of 36.5m, 2 cantilever spans of 40.5+10m,2 rider spans of 5m. Total length = 549m Prestressed box girder Well foundation 2002-2005 500 Completed
Dundai aqueduct under Sindh project Phase II, Shivpuri, M.P. 5 spans of 21m. Total  length

= 105.0m

RCC single cell box girder Open foundation 2000-2003 222 Completed
H.L.bridge across Pench river in Km  20/8 of Chhindwara – Narsinghpur road, Dist. Chhindwara, M.P. BOT project 12 spans of 14.5m. Total length – 174m RCC solid slab Open foundation 2002-2002 135 Completed
Submersible bridge across Sindh river @ Narad Dev  – Magrol road, Dist. Bhind, M.P. 3 spans of 21.85m and 23 spans of 6m. Total length – 203.55m. RCC voided slab and solid slab for 6m span Well and open foundation 2002 -2003 92 Completed
High level bridge across Kunwari river in Km 3/4 on Rampur – Gobra road, Dist. Murena, M.P. 1 simply supported span of 28.3m. 2 cantilever spans of 28.3+7m. 2 rider spans of 5m.Total length – 108.9m RCC box girder and rider span is solid slab Open foundation

 

2001- 2003 85 Complete
Submersible bridge across Chopat river at Km on Vijaypur – Dharnawada road, Dist. Murena, M.P 7 spans of 15m. Total length – 105m RCC solid slab Open foundation 2001 -2002 79 Completed
Submersible bridge across Thel river in Km 18/2 on Dallitola – Bijadeori road, Dist. Seoni, M.P. 6 spans of 15m. 3 units of 2 span continuous slab RCC solid slab Open foundation 2001-2003 68
 

 

Complete
Submersible bridge across Thel river on Sagar – Bakoda – Seoni road, Dist. Seoni, M.P. 5 spans of 14.4m. Total length – 72m RCC solid slab Open foundation 2001-2002 55 Completed
Construction of Medium bridges at Km. 53/4 , 58/10, 68/8 & 18/8 on Ratlam – Badnawar- Nagda Road. Distt. Ratlam M.P.B.O.T. project 2 spans of 12.0m.

2 spans of 10.0m.

1 spans of 25.0m.

3 spans of 10.0m.

RCC solid slab 2003 -2005 2003- 2005 150 Completed
High Level bridge across Indar river at km. 11/8 on Madha – Indar road Distt. Shivpuri M.P. 3 spans of 10.0m. RCC solid slab Open foundation 2003 -2003 40 Completed
Submersible bridge across Kalisindh at km. 2/10 river on Dewlabihar – kaithlai road, Dist. Shajapur, M.P. 11spans of 15.0m. Total length – 165m RCC solid slab Open foundation 2003 -2004 135 Completed
Aqueduct across

Tamas river on
Bansagar Purwa

Canal Dist. – Satna

12 spans of 37.5 m. Total length – 450 m Prestressed box girder Pile / open

foundation

2006 -2008 1200 Completed
High Level bridge across Patnay river on Hardua –Shahnagar     road Distt. Panna 15 spans of 10.84 m. Total length – 162.6 m RCC solid slab Open foundation 2007 -2008 166 Completed
High Level bridge across Kaith river on Garhakota -Rehli    road  Distt. Sagar 8 spans of 15.0m. Total length –

120 m

RCC solid slab Open foundation 2007 165 In Progress

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

%d bloggers like this: